TM 5-3820-233-35/2
1 Bearing
2 Fitting
3 Housing
Figure 33-4. Bearing assembly, exploded TV.
Section II. OVERHEAD CONVEYOR
57. General
g. Tail Pulley Beating Disassembly.
Refer to
figure
The overhead conveyor is located on top of the plant
and consists of three sections. The overhead conveyor
h. Cleaning, Inspection, and Repair
receives the aggregate from the primary plant and
(1) Clean all parts in an approved cleaning
conveys it to the vibrating screen. The left and right
solvent and dry thoroughly.
hand head pulley bearing assemblies are similar in
(2) Inspect conveyor frames for serious
construction and maintenance procedures.
damage. Repair or replace a damaged frame.
(3) Inspect pulleys for dents, cracks and other
overhead conveyor.
damage. Repair or replace damaged pulley.
b. Disassembly.
Disassemble the overhead
(4) Inspect bearings for scoring, pitting, and
conveyor in the numerical sequence as illustrated on
binding. Replace a defective bearing.
(5) Inspect skirtboards and flashing for wear
c. Head
Pulley
Bearing
Disassembly.
and damage, and replace if necessary.
Disassemble bearing assemblies (79 and 80, fig. 34-1)
as illustrated on figure 34-3.
d. Trough Roll Disassembly.
Refer to
para 56.
Located in back of manual.
e. Return Roll Disassembly.
Refer to
para 56.
f. Impact Roll Disassembly.
Disassemble the
impact roll assembly as illustrated on figure 342.
4-5