Chapter 1. INTRODUCTION - TM-5-3820-233-12-10010Engine.Figure 1-1. Jaw crusher plant, left side.Figure 1-2. Jaw crusher plant, right side.Figure 1-3. Wiring diagram. - TM-5-3820-233-12-10014Chapter 3. OPERATING INSTRUCTIONSInstallation - TM-5-3820-233-12-10016Jaw Crusher Product SizesTable 2-1. Jaw crusher product sizes.Figure 2-3. Primary and secondary hook up and flow (sheet 1 of 2)Figure 2-3. Primary and secondary hook up and flow (sheet 2 of 2)Section II. MOVEMENT TO A NEW WORKSITEFigure 2-6. Air brake hook up, prime mover to plant.Figure 2-7. Stabilizing jacks.Figure 2-8. Towing the dolly.Figure 2-9. Marker lamp connections.Figure 2-10. Feeder, removal and installation (sheet 1 of 2)Figure 2-10. Feeder, removal and installation (sheet 2 of 2)Figure 2-11. Power unit, removal and installation.Section III. CONTROLS AND INSTRUMENTSFigure 2-13. Controls and instruments.GeneralStopping - TM-5-3820-233-12-10032Section V. OPERATION UNDER UNUSUAL CONDITIONS - TM-5-3820-233-12-10033Operation in Extreme Heat - TM-5-3820-233-12-10034Chapter 3. OPERATOR'S MAINTENANCE INSTRUCTIONS - TM-5-3820-233-12-10035Table 3-1. Preventive Maintenance Checks and ServicesSection IV. TROUBLESHOOTING - TM-5-3820-233-12-10037Primary Fuel Filter Element - TM-5-3820-233-12-10038Figure 3-1. Secondary and primary fuel filter element, removal and replacement. - TM-5-3820-233-12-10039Figure 3-2. Oil filter serviceRadiatorFigure 3-3. Fan belt, removal, installation and adjustment.Figure 3-4. Air cleaner service. - TM-5-3820-233-12-10043Batteries - TM-5-3820-233-12-10044Chapter 4. ORGANIZATIONAL MAINTENANCE INSTRUCTIONS - TM-5-3820-233-12-10045Table 4-1. Preventive Maintenance Checks and Services - TM-5-3820-233-12-10046Section VI. TROUBLESHOOTING - TM-5-3820-233-12-10047Figure 4-1. Radio suppression components. - TM-5-3820-233-12-10048Engine Fuel SystemFigure 4-3. Fuel injector, removal and installation. - TM-5-3820-233-12-10050Figure 4-4. Timing fuel injectors.Figure 4-5. Adjusting valve clearance.Primary and secondary Fuel Filter - TM-5-3820-233-12-10053Figure 4-7. Fuel tank, lines and fittings, removal and installationFuel Tank, Line and FittingsFigure 4-9. Air cleaner, aspirator and muffler, removal, disassembly, reassembly and installation.Lubrication System - TM-5-3820-233-12-10057Oil Cooler - TM-5-3820-233-12-10058Figure 4-12. By-pass oil filter disassembly and reassembly.Lubricating Oil LinesFigure 4-13. Water manifold, removal and installation.Thermostat - TM-5-3820-233-12-10062Figure 4-15. Water tubes, hoses and fittings, removal and installation.Water Pump - TM-5-3820-233-12-10064Engine Controls - TM-5-3820-233-12-10065Fuel Pressure Switch - TM-5-3820-233-12-10066Water Temperature Switch - TM-5-3820-233-12-10067Sending Units - TM-5-3820-233-12-10068Electrical System - TM-5-3820-233-12-10069Polarizing the GeneratorFigure 4-25. Batteries, cables and battery box, removal and installation.Starting Motor - TM-5-3820-233-12-10072Figure 4-28. Slave receptacle, removal and installation.Side Panels and Hood - TM-5-3820-233-12-10074Figure 4-30. Side panels and hood, removal and installation (sheet 1 of 3).Figure 4-30. Side panels and hood, removal and installation (sheet 2 of 3).Figure 4-30. Side panels and hood, removal and installation (sheet 3 of 3).Figure 4-31. Side panels and hood assembly, exploded view.Instrumental PanelEngine Clutch AdjustmentConveyor BeltsFigure 4-36. Conveyor belt cutting. - TM-5-3820-233-12-10082Figure 4-38. Conveyor belt fastener installation (sheet 1 of 2)Figure 4-38. Conveyor belt fastener installation (sheet 2 of 2) Figure 4-40. Conveyor belt training. - TM-5-3820-233-12-10085Skirtboards and FlashingBelt Wiper - TM-5-3820-233-12-10087Conveyor Pulley Lagging - TM-5-3820-233-12-10088Figure 4-45. Positioning lagging.Figure 4-47. V-belt installation.Figure 4-48. Countershaft to head pulley and power unit, V-belt adjustment.Figure 4-49. Power unit to jaw crusher, V-belt adjustment.Table 4-3. V-Belt DeflectionClutch and Clutch ControlsFigure 4-53. Clutch, adjustment.Reciprocating FeederFigure 4-56. Support shaft, removal and installation. Eccentric ShaftFigure 4-58. Eccentric drive adjustment.Figure 4-59. Hopper, removal and installation.Hopper LinersJaw Crusher - TM-5-3820-233-12-10102Key PlatesMovable Jaw WedgeTension Spring and RodCrusher Discharge OpeningFigure 4-66. Discharge opening adjustment.Toggle PlateFigure 4-67. Toggle plate removal.Base Toggle SeatFigure 4-69. Toggle seat and base toggle seat, removal and installation.Toggle SeatFigure 4-70. Walkway and ladder, removal and installation (sheet 1 of 2)Walkway and Ladder - TM-5-3820-233-12-10114Figure 4-70. Walkway and ladder, removal and installationGuardsFigure 4-71. Guard, removal and installation.FendersFigure 4-72. Fender, removal and installation.Tool BoxStabilizing JacksFigure 4-75. Stabilizing jack, removal and installation.Figure 4-76. Stabilizing jack, disassembly and reassembly.Dolly - TM-5-3820-233-12-10124Figure 4-77. Flexastik and jack support, removal, disassembly, reassembly and installation.Figure 4-78. Fifth wheel, removal, disassembly, reassemly and installation.Figure 4-79. Dolly tires, wheels, and brake assembly, removal and installation.Dolly Air Brake SystemFigure 4-80. Dolly air brakes system, electrical wiring harness and lights, removal and installation.Dolly Electrical Wiring Harness and Lights - TM-5-3820-233-12-10130Figure 4-81. Crusher plant tire, wheel and brake assembly, removal and installationCrusher Plant Air Brake SystemFigure 4-82. Crusher plant, air brake system, removal and installation.Figure 4-83. Crusher plant wiring harness and light, removal and installation.Appendix A. REFERENCESAppendix B: MAINTENANCE ALLOCATION CHART - TM-5-3820-233-12-10136Section II. MAINTENANCE ALLOCATION CHART - TM-5-3820-233-12-10137Section II. MAINTENANCE ALLOCATION CHART (Cont) - TM-5-3820-233-12-10138Section II. MAINTENANCE ALLOCATION CHART (Cont) - TM-5-3820-233-12-10139Section II. MAINTENANCE ALLOCATION CHART (Cont) - TM-5-3820-233-12-10140Appendix C: BASIC ISSUE ITEMS LIST - TM-5-3820-233-12-10141Section II. BASIC ISSUE ITEMS - TM-5-3820-233-12-10142Section III. MAINTENANCE AND OPERATING SUPPLIES - TM-5-3820-233-12-10143TM-5-3820-233-12-1 Crusher Jaw Diesel Engine Driven Semitrailer Mounted 35 ton per hour Capacity Component of Crushing and Screening Plant Diesel Engine Driven Manual