TM 5-3820-233-12/2
Figure 2-2. Battery cable to starter connection.
wise with the carpenter's level issued with the equipment.
2-2. Installation
Use planking under wheels on low side to accomplish
a. Place the secondary unit on a reasonably level
leveling the unit. Level across the frame at the elevating
surface with its feed conveyor hopper under the
wheel, roll crusher, and intake end of screen.
discharge end of the primary unit delivery conveyor.
(2) Block rear wheels with chock block
Allow sufficient space on each side of unit for trucks
assembly.
receiving finished material from the delivery and sand
(3) Before lowering the jacks place a 3" by 12"
conveyors. Where possible, face the operator's platform
wide plank with ample length to extend 2' beyond each
and the power unit in the general direction from which
jack. If the load carrying capacity of the soil is low, it may
the wind most frequently blows. By placing the unt in this
be necessary to place additional planking under the
position, dust will blow away from the operator and power
jacks to increase the bearing surface for the jacks.
(4) Lower the jacks into the vertical position as
primary and secondary hook up and flow operation.
(1) Level the unit both lengthwise and cross-
2-2