b.
Installation.
(1)
Using a suitable lifting device and
slings, position the pan feeder
assembly on the crusher frame.
(2)
feeder mounting brackets on the unit.
(3)
Connect the hydraulic cylinder to the
(4)
Install the clearance lights, conduit,
(5)
Install the pan feeder drive motor and
32. Scalper Vibrating Screen Assembly a. Removal.
(1) Remove the scalper vibrating screen
drive motor and belts (TM 5-3820-
205-20/2).
(2) With the pan feeder assembly in the
loosen the scalper vibrating screen
Figure 2.
assembly.
(3)
Connect the battery leads to the
scalper vibrating screen.
engine (TM 5-382-205-20/2).
(4)
Position the drive belts on the engine
b.
Installation.
sheave and adjust tension (TM 5-
(1) Using a suitable lifting device and
3820-205-20/2).
slings, position the scalper vibrating
(5)
Install the drive belt guard (TM 5-
screen assembly on the diagonal
3820-205-20/2).
support.
31. Pan Feeder Assembly
scalper vibrating screen assembly on
a.
Removal.
the diagonal support.
(1) Remove the pan feeder drive motor
(3) Install the scalper vibrating screen
drive motor and belts (TM 5-3820-
(2) Remove the clearance lights, conduit,
205-20/2).
(3) Disconnect the hydraulic cylinder from
33. Crusher Assembly
the pan feeder (TM 6-3820-2020/2).
a.
Removal.
(1) Remove the upper operator's platform
feeder mounting brackets.
(5) Using a suitable lifting device and
(2) Remove the crusher unit drive belt
slings, remove the pan feeder
assembly.
(3) Loosen the engine adjustment and
remove the drive belts from the engine
AGO 8456
18