• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Fuel primer and fuel filters, removal and installation.
Figure 15. Handcranking assembly, removal and installation.

Maintenance Manual For Crusher, Roll: Diesel And Electric Driven, Pneumatic Tires, 75 Ton Per Hour - Vol1 Page Navigation
  26    27    28    29    30  31  32    33    34    35    36  
img
. . . .
62. Ether Starting Aids
(2) Start the engine (TM 5-3820-205-10/1).
a. Removal.
(3) Hold a target 12 inches from the nozzle
(1) Remove the ether starting aids and
end, and observe the spray pattern for
bracket from the instrument panel as
deflected spray or a spray pattern that is
instructed on figure 20.
not symmetrical.
(2) Remove the ether starting aid lines from
(4) Inspect the nozzle for dripping or leaking
the intake manifolds (para. 60).
around the capnut.
b.  Cleaning and Inspection.  Clean and inspect all
(5) Test the remaining fuel injectors in a
parts. Replace damaged parts.
similar manner.
c. Installation.
(6) Stop the engine (TM 5-3820-205-10/1)
(1) Install the ether starting aid lines on the
and replace a defective injector.
intake manifolds (para. 60).
Warning: Keep hands away from nozzle spray.
(2) Install the ether starting aids and bracket
The high velocity may puncture the skin and cause
on the instrument panel in reverse of the
blood poisoning.
instructions on figure 20.
Figure 14. Air cleaner indicator, removal and installation.
AGO 8157A
33


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.