TM 5-3820-233-12/2
c. Using the winch handle, lower the conveyor to a
conveyor belt.
plank support.
d. Remove screws and nuts at center break, to
(2) Attach a suitable lifting device to the
conveyor frame.
allow conveyor to fold.
(3) Release the hoisting cable from the slave
e. Remove the head pulley cable and attach to outer
winch (fig.2-5) and unwrap cable from the overhead idler
groove of center pulley.
pulley, conveyor cable head and center pulleys. Coil the
f. Fold conveyor into place and attach safety chain.
cable and strap it to the conveyor.
2-7. Rock and Sand Conveyor
(4) Disconnect conveyor middle frame from the
conveyor tail frame.
remove the rock conveyor as follows:
(5) Disconnect conveyor pivot point and re-
NOTE
move conveyor from the crushing unit.
If the rock conveyor is in a folded position,
c. Rock Conveyor Installation.
NOTE
conveyor belt.
String the hoisting cable as illustrated in
(2) Attach a suitable lifting device to the
conveyor frame.
(3) Release the hoisting cable from the over-
d. Sand Conveyor- Installation.
head idler pulley and the hoisting cable from the head
and center cable pulleys. Turn winch to re- move cable
NOTE
slack.
String the hoisting cable as illustrated in
(4) Disconnect conveyor middle frame from the
the slave winch.
(6) Remove conveyor from the crushing unit.
remove the sand conveyor as follows:
Figure 2-5. Rock and sand conveyor, removal and installation (sheet 1 of 3).
2-8