• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE ALLOCATION CHART - Continued
SECTION II. MAINTENANCE ALLOCATION CHART - Continued

Technical Manual For Compactor, High Speed, Tamping Self-Propelled Page Navigation
  844    845    846    847    848  849  850    851    852    853    854  
img
APPENDIX C
SECTION II. MAINTENANCE ALLOCATION CHART
FOR
COMPACTOR, HIGH SPEED TAMPING, SELF-PROPELLED (CCE)
(1)
(2)
(3)
(4)
(5)
(6)
TOOLS
GROUP
COMPONENT/ASSEMBLY
MAINTENANCE
MAINTENANCE CATEGORY  AND
NUMBER
FUNCTION
C
O
F
H
D
EQPT  REMARKS
01
ENGINE
1,2,3,4
0100
Engine Assembly
Test
1.5
Service
0.2
Replace
16.0
Repair
51.2
Overhaul
80
Engine Mounts
Replace
8.0
0101
Cylinder Block
Repair
40
1,2,3,4
Replace
32.5
Cylinder Sleeve
Replace
2.0
Cylinder Head
Replace
4.0
Repair
6.7
Overhaul
16.8
0102
Crankshaft
Replace
16.0
1,2,3,4
Main Bearings
Replace
6.0
Drive Pulley
Replace
3.0
0103
Flywheel
Replace
8.0
1,2,3,4
Repair
2.0
Flywheel
Replace
8.0
Repair
2.0
0104
Pistons and Connecting
Replace
2.0
1,2,3,4
Rods
Repair
1.5
Rings and Bearings
Replace
1.0
0105
Rocker Arms
Replace
2.0
1,2,3,4
Valve Springs
Test
1.0
Replace
2.5
*The Subcolumns are as follows:
C--operator/crew
F--direct support
D-depot
O--organizational
H--general support
14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.