TM 5-3820-205-10-2o.Remove the jaw crusher electrical coupling connector and airbrake hoses (fig. 1) from the jaw crusher and stowin the toolbox.p.Install the air cleaner channel holding bracket. Position the air cleaner extension tubing with clamps. Install theprecleaner (fig. 17).10. Movement to a New Worksitea.Remove the power cable from the electrical control panel (fig. 16) and wind power cable on the power cable reelassembly (fig. 1).b.Remove the ground rod assembly (fig. 15) and stow in the toolbox (fig. 1).c.Remove the precleaner, air cleaner extension tubing with clamps, and air cleaner channel holding bracket (fig.17).d.Remove necessary mounting hardware from the operator's platform guard rails (fig. 14) to permit the guard railsto be lowered to the transport position (fig. 18).e.Remove the tension from the head belt scraper (fig. 13) and position the discharge conveyor in the transportcradle (fig. 18).f.Install the hydraulic hoist on the pan feeder in reverse of the instructions on figure 11 and lower the feeder to thetransport position (fig. 18) in reverse of the instructions on figures 7-10.TA507934Figure 17. Air intake extension tube and precleaner, and exhaust silencer removal and installation.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business