Table 1. Time Standards - Continued
Remove and Replacement
Man/Hours
Remove and Replacement
Man/Hours
1313 TIRES, TUBES
4004 VENTILATING SYSTEM
Tires
Guard, dust .................................... 0.2
(includes removal and installation
Fan, cooling
of wheel.) .................................. 0.8
(includes removal and installation
Tubes
of dust guard.) ........................... 0.5
(includes removal and installation
4005 FRAME SUPPORTS AND
of tires.)........................................... 0.8
HOUSINGS
15
FRAME
End assembly) frame, center
1601
FRAME ASSEMBLY
(includes removal and installation
Frame assembly
of motor. ) ................................ 7.5
(includes removal and installation
Box, junction
of ladders, platforms, drive guard,
(includes removal and installation
belts, engine, conveyor, feeder
of wires.) ................................... 0.4
assembly, screen, box assembly,
4007 DRIVE COMPONENTS
crusher assembly, cable reel, con
Pulley ............................................. 0.8
duit, wiring, hydraulic reservoir,
Belts ............................................... 0 5
cylinder, fuel tank, lines, brackets,
4009 CONTROL PANELS
electrical panels, dolly, bogie,
Housing, main control
and wheels.) ............................ 94.9
(includes removal and installation
Platforms; ladders .......................... 0.8
of wiring and clamps.) .............. 10.0
1503 PINTLES AND TOWING
4010 CONTROLS, STARTING: MAIN OR
ATTACHMENTS
AUXILIARY
Hooks, pintle .................................. 0.3
Starter, magnetic ............................ 1.0
1506 FIFTH WHEEL
Switches, push button, heater.......... 0.2
Fifth wheel assembly
4011 CIRCUIT BREAKERS
(includes removal and installation
Circuit breakers .............................. 4.1
of dolly from unit.) ..................... 2.5
4014 TERMINAL BOXES, PANELS OR
JUNCTION BLOCKS, WIRING,
Jacks, leveling ............................... 0.5
ETC.
18
HOOD
Conduit, power; connectors;
1801 HOOD
receptacle ...................................... 4.2
Panels, engine side ............................ 0.5
Cable, power .................................. 0.5
Hood; doors .................................... 1.6
Wiring ............................................. 4.2
Panels; cowl
4018 TERMINAL BLOCKS
(includes removal and installation
of engine side panels, hood and
Cable ............................................. 0 5
doors.) ....................................... 2.5
Wiring ............................................ 4.5
1808 STOWAGE RACKS, BOXES, STRAPS
43
HYDRAULIC, AIR AND VACUUM
Box, tool ......................................... 0.4
SYSTEMS (EXCLUDING BRAKE SYSTEM)
Reel, power cable ........................... 1.0
4301 HOSE, PIPE, FITTINGS
22
ACCESSORY ITEMS
Tubing, hose ................................. 0.5
2202 ACCESSORY ITEMS
4302 PUMP AND MOUNTING PARTS
Reflectors .......................................... 0.2
Pump and mounting parts ............... 1.0
2210 DATA PLATES AND INSTRUCTION
4307 HYDRAULIC CYLINDERS
HOLDERS,
Cylinder, hydraulic
Plates, data ............................... 0.8
(includes removal and installation
Plates, identification and instruction;
of lines and fittings.) ....................... 1.8
holder, instruction ...................... 0.3
4308 RESERVOIRS
40
ELECTRIC MOTORS
Reservoirs, oil ................................ 1.5
4000 MOTOR ASSEMBLY
47
GAGES; MEASURING DEVICES
Motor assemblies
4701 INSTRUMENTS, SPEED
(includes removal and installation
of belts and pulley.)......................... 2.5
4001 ROTOR ASSEMBLIES
ation
Rotors ............................................ 4.5
(includes removal and installation
4002 STATOR ASSEMBLIES
of instrument only.)..................... 0.2
4702 GAGES
Stator assemblies
7.5
Gage, fuel .......................................... 0.4
AGO 8456A
9