TM 5-3820-233-12/1
sequence.
4-75. Walkway and Ladder
b. Inspection. Inspect all parts for wear and damage
and replace all defective parts.
The primary unit walkway and ladder is located directly
c. Installation.
above the jaw crusher. It serves as a platform from
which the operator can control the operation of the plant.
install the ladder and walkway in the reverse procedure
a. Removal.
of removal.
disassemble the walkway and ladder in numerical
28 Nut
59 Capscrew
29 Lockwasher
60 Ladder
30 Bolt
61 Nut
31 Liner
62 Lockwasher
32 Nut
63 Brace
33 Lockwasher
64 Capscrew
34 Bolt
65 Nut
35 Liner
66 Lockwasher
36 Nut
67 Capscrew
37 Lockwasher
68 Ladder
38 Capscrew
69 Nut
39 Deflector
70 Lockwasher
40 Deflector
71 Capscrew
41 Nut
72 Brace
42 Lockwasher
73 Nut
43 Washer
74 Lockwasher
44 Capscrew
75 Capscrew
45 Shim
76 Stringer
46 Nut
77 Nut
47 Lockwasher
78 Lockwasher
48 Bolt
79 Capscrew
49 Liner
80 Support
50 Platform
81 Washer
51 Nut
82 Bolt
52 Lockwasher
83 Side
53 Washer
54 Capscrew
84 Nut
55 Walkway
85 Lockwasher
56 Nut
86 Washer
57 Lockwasher
87 Capscrew
58 Washer
88 Platform
4-70