TM 5-3820-205-10-1
Figure 18. Main control panel circuit breakers {Model 5230D).
Caution: Do not exceed 20 mph on good hard surface road or 10 mph on secondary roads or
cross-country when towing the roll crusher.
m. Attach suitable towing vehicle to the roll crusher, remove the wheel chock and stow them in the bracket on
the frame (fig. 4).n. Install and set up the roll crusher (para 9). Install precleaner, air cleaner extension
tubing with clamps, and air cleaner channel holding bracket (fig. 54).
n. Install and set up the roll crusher (para 9). Install precleaner, air cleaner extension tubing with clamps, and
air cleaner holding bracket (fig. 43).
Section II. CONTROLS AND INSTRUMENTS
11. General
This section describes, locates, illustrates, and furnishes the operator or crew sufficient information about the
various controls and instruments for proper operation of the roll crusher.
12. Controls and Instruments
Caution: Operator's switch boxes must be properly closed and sealed to prevent water from
entering the box and causing switches and controls to corrode and become unserviceable. All control
boxes should be examined to assure that doors are properly sealed and closed tight.
The purpose, location, use of the controls, and normal readings of the instruments and gages are
illustrated on figures 19-28.
TA507888
17