TM 5-3820-205-10-1Figure 18. Main control panel circuit breakers {Model 5230D).Caution: Do not exceed 20 mph on good hard surface road or 10 mph on secondary roads orcross-country when towing the roll crusher.m. Attach suitable towing vehicle to the roll crusher, remove the wheel chock and stow them in the bracket onthe frame (fig. 4).n. Install and set up the roll crusher (para 9). Install precleaner, air cleaner extensiontubing with clamps, and air cleaner channel holding bracket (fig. 54).n. Install and set up the roll crusher (para 9). Install precleaner, air cleaner extension tubing with clamps, andair cleaner holding bracket (fig. 43).Section II. CONTROLS AND INSTRUMENTS11. GeneralThis section describes, locates, illustrates, and furnishes the operator or crew sufficient information about thevarious controls and instruments for proper operation of the roll crusher.12. Controls and InstrumentsCaution: Operator's switch boxes must be properly closed and sealed to prevent water fromentering the box and causing switches and controls to corrode and become unserviceable. All controlboxes should be examined to assure that doors are properly sealed and closed tight.The purpose, location, use of the controls, and normal readings of the instruments and gages areillustrated on figures 19-28.TA50788817
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business