Figure 29. Battery box, removal and installation.
Figure 31. Battery charging receptacle, removal and installation.

Maintenance Manual For Crusher, Roll: Diesel And Electric Driven, Pneumatic Tires, 75 Ton Per Hour - Vol2 Page Navigation
  40    41    42    43    44  45  46    47    48    49    50  
img
Figure 30. Battery box, exploded view.
screws securing the cutout relay contact bracket to the cutout relay and raise or lower the cutout relay contact bracket
until the specified air gap is obtained. Secure the adjustment by tightening the two screws.
(g)  Push down on the voltage regulator armature (2, fig. 33) until the voltage regulator contact point barely
touches the air gap adjusting screw. Measure the air gap between the coil core and the armature of the
voltage regulator. Do not measure