• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Fuel pump, filters, and lines.
Section IV. TROUBLESHOOTING

Maintenance Manual For Crusher, Roll: Diesel And Electric Driven, Pneumatic Tires, 75 Ton Per Hour - Vol1 Page Navigation
  10    11    12    13    14  15  16    17    18    19    20  
img
. . . . . .
CHAPTER 3
GENERAL MAINTENANCE INSTRUCTIONS
Section I. SPECIAL TOOLS AND EQUIPMENT
13. Special Tools and Equipment
14. Organizational Maintenance Repair Parts
No special tools or equipment are required by
Organizational maintenance repair parts are listed
organizational  maintenance  personnel  to  perform
and illustrated in TM 5-3820-205-20P/1.
maintenance on the roll crusher.
Section II. LUBRICATION
15. General
(2) Inspect all parts for excessive wear or
This section contains instructions for the lubrication
damage.
Replace any unserviceable
of the wheel bearing assemblies and starter inboard
parts.
bearing.  Refer to current lubrication order for proper
(3) Pack wheel bearing assemblies with the
time interval and the type and grade of lubricant to be
type and grade of grease indicated on the
used.
current lubrication order.
c. Wheel Reassembly and Installation. For wheel
16. Lubricating Wheel Bearing Assemblies
reassembly and installation, refer to paragraph 112.
a. Wheel Removal and Disassembly.  For wheel
removal and disassembly, refer to paragraph 112.
17. Lubricating the Starter Inboard Bearings
b. Cleaning, Inspection, and Lubrication.
a. Starter Removal.  Remove the starter (para.
(1) Clean  wheels,  hubs,  and  bearing
82).
assemblies  with  approved  cleaning
b. Cleaning, Inspection, and Lubrication.
solvent and dry thoroughly with a clean,
Lubricate  the  starter  inboard  bearings  in
lint free cloth.
accordance with LO 5-3820-205-20/1.
c. Starter Installation. Install the starter (para. 82).
Section III. PREVENTIVE MAINTENANCE SERVICES
immediately if a deficiency is noted during operation
18. General
which would damage the equipment if operation were
To insure that the roll crusher is ready for operation
continued.  All deficiencies and shortcomings will be
at all times, it must be inspected systematically, so that
recorded together with the corrective action taken on DA
defects may be discovered and corrected before they
Form 2404 at the earliest possible opportunity.
result in serious damage or failure.  The necessary
preventive maintenance services to be performed are
19. Quarterly Preventive Maintenance Services
listed and described in paragraph 18. The item numbers
indicate  the  sequence  of  minimum  inspection
a. This paragraph contains an illustrated tabulated
requirements. Defects discovered during operation of
listing of preventive maintenance services which must
the unit will be noted for future correction, to be made as
be performed by organizational maintenance personnel
soon as operation has ceased.
Stop operation
at quarterly intervals.
AGO 8157A
17


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.