• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 78. Grizzly bars, removal and installation.
Figure 81. Diverter box, chutes, and gate, exploded view.

Maintenance Manual For Crusher, Roll: Diesel And Electric Driven, Pneumatic Tires, 75 Ton Per Hour - Vol2 Page Navigation
  96    97    98    99    100  101  102    103    104    105    106  
img
. . . .
152. Diverter Box, Chutes, and Gate
a. Removal. Remove the diverter box and coarse chute as instructed on figure 80.
b. Disassembly. Disassemble the diverter box, chutes, and gate as illustrated on figure 81.
c. Cleaning, Inspection, and Repair. Clean and inspect all parts.  Repair or replace worn or defective parts as
required.
d. Reassembly. Reassemble the diverter box, chutes, and gate as illustrated on figure 81.
e. Installation. Install the diverter box and coarse chute in reverse of instructions on figure 80.
A-Diverter box installed
B-Coarse chute installed
Figure 80. Diverter box and coarse chute, removal and installation.
AGO 8156A
103


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.