• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 52. Crusher frame assembly, exploded view.
Figure 53. Discharge conveyor belt, removal and installation.

Maintenance Manual For Crusher, Roll: Diesel And Electric Driven, Wheel Mounted 75 Ton Per Hour - Vol2 Page Navigation
  94    95    96    97    98  99  100    101    102    103    104  
img
. . . .
1
Nut, 5/8-18 (8 rqr)
16
Cheek plate, lower
2
Washer, lock, 5/8 in. (8 rqr)
17
Cheek plate, upper
3
Lubrication fitting (2 rqr)
18
Cheek plate, lower
4
Screw, cap, special (2 rqr)
19
Nut, 1-8 (10 rqr)
6
Bearing half (2 rqr)
20
Washer, lock, 1 in. (10 rqr)
6
Adjusting wedge
21
Bolt, machine, 1-8 x 4 in.
7
Pushing wedge
22
Stationary jaw
8
Screw, cap, 3/4-10 x 2 in. (2 rqr)
23
Nut, 1-8 (8 rqr)
'9
Washer, lock, 3/4 in. (2 rqr)
24
Washer, lock, 1 in. (6 rqr)
10
Washer, flat, 3/4 in. (2 rqr)
25
Bolt, machine, 1-8 x 4 in. (6 rqr)
11
Toggle seat
26
Outside wedge (2 rqr)
12
Nut, 1-8 (14 rqr)
27
Center wedge (2 rqr)
13
Washer, lock, 1 in. (14 rqr)
28
Adjusting bolt
14
Bolt, machine, 1-8 x 4 in. (14 rqr)
29
Crusher frame
15
Cheek plate, upper
Figure 51-Continued.
b. Installation.
171.  Crusher Frame Assembly Reassembly and
Installation
(1) Install the pitman gear and ratchet assembly
(par. 167).
a. Reassembly. Refer to figure 52 and reassemble
the crusher frame assembly in the reverse order.
(2) Install the pitman assembly (par. 163).
(3) Install the crusher assembly (par. 88).
AGO 8461A
101


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.