TM 5-3820-233-35/2
(3) Release the hoisting cable from the
(4) Remove the hoisting cable from the head
and center cable pulleys (fig. 4B) and turn
winch to remove cable slack.
(5) Disconnect conveyor middle frame from
the conveyor tail frame (fig. 4A).
(6) Disconnect conveyor pivot points 1 and 2
(7) Remove conveyor from the plant.
b. Sand Conveyor Removal
Note
If the conveyor is in the folded
position, refer to the Operator's
Figure 4 (1). Rock conveyor, removal and
Manual and lower the conveyor.
installation.
(1) Refer to the Operator's Manual and
remove the conveyor belt
(2) Attach a suitable lifting device to the
conveyor frame.
B-CONVEYOR REMOVAL.
2-6