• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 37. Gages and switch, removal and installation.
Figure 40. Overspeed governor, removal and installation

Maintenance Manual For Crusher, Roll: Diesel And Electric Driven, Pneumatic Tires, 75 Ton Per Hour - Vol1 Page Navigation
  55    56    57    58    59  60  61    62    63    64    65  
img
. . . . . . .
(2)
Install the door supports and side panels
(para. 93).
(3) Install the muffler (para. 73).
e. Rear Panel Installation.
(1) Install the rear panel on the unit in reverse
of the instructions on figure 44.
(2) Install the indicator gages (paras. 8385,
and 88).
(3) Install the tachometer - hourmeter (para.
54).
(4) Install the safety ignition switch (para. 87).
(5) Install the ether starting aids (para. 62).
(6) Install the air cleaner (para. 59).
Figure 39. Water temperature gage sending unit
and manifold, removal and installation.
Figure 38. Oil pressure gage sending unit, removal
and installation.
AGO 8157A
62


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.