Figure 5. Discharge conveyor assembly, removal and installation
(8)
Install the upper operator's platform
sheave and jaw drive sheave (TM 5-
3820-205-20/2).
34. Discharge Conveyor Assembly
(4)
Remove the scalper vibrating screen
a.
Removal.
(5)
(1) Remove the conveyor support frame
(6)
(TM 5-3820-2020/2).
diagonal supports.
(2) Remove the conveyor drive motor,
(7)
mounting frame, and belts (TM 5-
crusher assembly.
3820-205-20/2).
b.
Installation.
discharge conveyor assembly.
crusher assembly on the unit.
b.
Installation.
diagonal supports.
(3) Install the scalper vibrating screen
(1)
discharge conveyor assembly on the
(4) Position the drive belts on the jaw
unit.
drive sheave and engine sheave (TM
(2)
(3)
Install the conveyor drive motor,
(5) Adjust the drive belts (TM 5-3820-
mounting frame, and belts (TM 5-
205-20/2).
3820-206-20/2).
(6) Install the crusher drive belt guards
(4)
Install the conveyor support frame
21