• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 40. Hydraulic cylinder assembly, exploded view.
Section VII. FEEDER FRAME ASSEMBLY

Maintenance Manual For Crusher, Roll: Diesel And Electric Driven, Wheel Mounted 75 Ton Per Hour - Vol2 Page Navigation
  75    76    77    78    79  80  81    82    83    84    85  
img
. . . . . .
Section VL PAN FEEDER APRON ASSEMBLY
136. General
138.
Pan Feeder Apron Assembly Cleaning,
The pan feeder apron assembly consists of the pans
Inspection, and Repair
and chain belting which move the course rock to the
vibrating scalper screen assembly.
a.  Cleaning.  Clean all parts in an approved
cleaning solvent and dry thoroughly.
137. Pan Feeder Apron Assembly Removal
b. Inspection and Repair.
a. Remove the pan feeder assembly (par. 31).
(1) Inspect  the  pans  for  breaks,  bends,
Remove electric drive motor (TM 5-820205-
b.
warpage, and elongated mounting holes.
20/2).
(2) Inspect all pins for wear, bends, and rust.
c. Remove hopper assembly (par. 121).
(3) Inspect all inner and outer links for cracks,
breaks, and other damage.
Remove feeder gear reducer assembly (par.
d.
125).
(4) Inspect all mounting hardware for defective.
threads.
e. Remove pans (TM 5-3820-205-20/2).
(5) Replace or repair all defective parts as
f. Refer to figure 41 and remove the pan feeder
necessary.
apron assembly.
Figure 41. Pan feeder apron assembly, removal and installation.
AGO 8456A
82


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.