• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 57. Tail shaft pulley, exploded view.
CHAPTER 8. BOGIE, FRONT AND REAR AXLE, AND BRAKE ASSEMBLY REPAIR INSTRUCTIONS

Maintenance Manual For Crusher, Roll: Diesel And Electric Driven, Wheel Mounted 75 Ton Per Hour - Vol2 Page Navigation
  101    102    103    104    105  106  107    108    109    110    111  
img
. . . . . . . . . . . . . . . . . . . . . . .
other damage. Replace or repair all unserviceable parts
(2) Remove the conveyor belt assembly (par.
as necessary.
173).
191. Discharge Conveyor Head and Tail Shaft
(3) Refer to figure 55 and remove the
Pulleys Reassembly and Installation
conveyor head and tail shaft pulleys from
the unit.
a. Reassembly.
b. Disassembly.
(1) Refer to figure 56 and reassemble the
head shaft pulley in the reverse order.
(1) Refer to figure 56 and disassemble the
head shaft pulley.
(2) Refer to figure 57 and reassemble the tail
shaft pulley in the reverse order.
(2) Refer to figure 57 and disassemble the
tail shaft pulley.
b. Installation.
190. Discharge Conveyor Head and Tail Shaft
(1) Refer to figure 55 and install the conveyor
Pulleys Cleaning, Inspection, and Repair
head and tail shaft pulley on the unit.
a. Cleaning.  Clean all parts with an approved
(2) Install the conveyor belt assembly (par.
cleaning solvent. Dry thoroughly.
175).
b. Inspection and Repair.  Inspect all parts for
(3) Install  the  conveyor
gear
reducer
cracks, breaks, wear, distortion, stripped threads, and
assembly (par. 183).
Section VI. DISCHARGE CONVEYOR FRAME ASSEMBLY
192. General
Inspect the frame
b. Inspection and Repair.
assembly for cracks, breaks, bends, elongated holes,
The conveyor frame assembly is a one piece,
and stripped or broken threaded openings. Replace or
welded steel construction. The frame has attachments
repair all unserviceable parts as necessary.
for mounting the head and tail pulleys, troughing rollers,
return rollers, conveyor belt, and the gear reducer
195. Discharge
Conveyor
Frame
Assembly
assembly.
Reassembly and Installation
193. Discharge Conveyor Frame Assembly Removal
a. Reassembly.
and Disassembly
(1) Install the head and tail pulleys (par. 191),
Remove the discharge conveyor
a. Removal.
conveyor belt (par.
175), conveyor
assembly (par. 34).
hopper (par. 187), and the gear reducer
assembly (par. 183).
b. Disassembly.
(2) Install the hopper liner strips, conveyor
(1) Remove the conveyor support brace, belt
drive  motor,  roller  assemblies,  belt
scraper assemblies, roller assemblies,
scraper assemblies, and the conveyor
conveyor drive motor, and the hopper
support brace (TM 5-3820-205-20/2).
liner strips (TM 5-3820-205-20/2).
b. Installation.
(2) Remove the conveyor belt (par.  173)
gear reducer assembly (par. 181) head
(1) Install the discharge conveyor assembly
and tail pulleys (par.
189), and the
(par. 34).
conveyor hopper (par. 185).
(2) Adjust the conveyor belt tension (TM 5-
194. Discharge
Conveyor
Frame
Assembly
3820-205-20/2).
Cleaning, Inspection, and Repair
a. Cleaning.  Clean the frame assembly with an
approved cleaning solvent. Dry thoroughly.
AGO 3456A
108


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.